A261/A7 motorway traffic routing

The renewal of the lanes on the A261 / A7 motorway required the preparation of traffic routing over a stretch of around five kilometres during the construction period. The traffic flows that varied greatly at different times as a result of school holidays, special events and circumstances extending beyond the specific site needed to be researched and coordinated with all those involved. Also, the local...

Extension work, Am Stadtrand

Before it was extended, the Am Stadtrand road, in the section between the junctions on the Friedrich-Ebert-Damm and Walddörferstraße, used to be a two-lane main throughway that handled around 20,000 cars a day. It was found that shifts in traffic flows meant that the traffic burden would double...

Opening of the Hallerstraße

Since the 1970s, the Hallerstraße in Hamburg's Rotherbaum district between the Rothenbaumchaussee and Mittelweg was only open to pedestrians and cyclists. However, the nearby tennis centre regularly stages major events so that the neighbouring residential areas often suffered drastic increases in traffic flows...

Development area, Metzendorfer Weg

The around two hectare area of Phoenix AG's former sports grounds in Hamburg's Eißendorf district was developed for the construction of residential buildings with around 64 units. An access road was laid out from which four residential drives branched. Catchments with run-offs were built...

Saseler Damm / Poppenbütteler Weg

The Saseler Damm / Poppenbütteler Weg intersection is located in the Poppenbüttel district of Hamburg. It was rebuilt in several sections with the aim of achieving more effective performance increases throughout the entire flow of traffic. The great burden of traffic and the excessive pressure on access from the direction of Poppenbütteler Markt resulted in public transport experiencing great difficulties...

Harburger Berge service station on the A7

As a result of extensive wear and tear, the surfacing at the service station on the A7 motorway to the south of Hamburg needed repairing. During construction, traffic had to be routed in such a way that the work could, on the one hand, be carried out in technically useful sections while, on the other, the services could remain open for business...

Major repairs, Schröderstiftstraße

The Schröderstiftstraße / Schäferkampsallee is a six-lane main road in Hamburg's Eimsbüttel district. The road surface was severely damaged and the adjacent areas die not satisfy current demands either in regard to the cross-section or manner of construction. The carriageway was renewed with asphalt in accordance with Construction Class SV...